A trusted Tier-1 supplier to global manufacturers

Working with us from the US

Drawings and materials
Send drawings in inches or millimeters. We work to your material specification, whether ASTM, SAE or EN.
Quotes
Our engineering team reviews each request and sends the quote in about 7 business days.
Quality
ISO 9001:2015 certified (IQR International, QMS-014904). PPAP, 8D, SPC and MSA; parts measured by 3D blue laser scanning at 0.02 mm (0.0008 in).
Shipping
Ocean freight from the port of Gemlik, near our Bursa plant. Port to port to the US East Coast typically takes about 3–4 weeks, depending on carrier and route. Delivery terms are agreed per project.
Time zones
Our office hours, 7:30 a.m.–5:30 p.m. Türkiye time (UTC+3), overlap with the US East Coast morning until about 9:30 a.m. ET (10:30 a.m. during daylight saving time).
Language
Our team works in English, Turkish and German.

Capabilities in US units

Tube bending5 CNC benders · up to Ø90 mm (3.5 in) diameter, 5 mm (0.20 in) wall, 6 m (19.7 ft) length · smallest bend radius 10 mm (0.39 in)
Presses7 presses (4 hydraulic, 3 mechanical) · largest 1,200 t (approx. 1,320 US tons) · bed up to 1600 × 2800 mm (63 × 110 in)
Sheet thickness0.5–20 mm (0.02–0.79 in)
Welding2 spot welding robots · 1 robotic MIG/MAG cell · 2 laser welding units · manual TIG
FinishingElectrostatic powder coating and wet painting · polishing
Plant6,000 m² (approx. 64,600 sq ft) in Bursa, Türkiye · 100+ employees · since 2004

Guides for US buyers: sourcing metal parts from Türkiye (shipping, Incoterms, duties, PPAP), EN–ASTM/SAE material equivalents, the tube bending design guide and our RFQ checklist.

Questions from US buyers

Do you accept drawings in inches and US material specifications?

Yes. We quote from inch or metric drawings and work to the material specification on your drawing, whether ASTM, SAE or EN.

How long does a quote take?

About 7 business days. Send a 3D model (STEP preferred) and a 2D drawing with tolerances, the material and your annual volume through our quote form.

How are parts shipped from Türkiye to the US?

By ocean freight from the port of Gemlik, near our plant in Bursa. Port to port to the US East Coast typically takes about 3–4 weeks, depending on carrier and route. Delivery terms are agreed per project.

Are steel parts from Türkiye subject to US import duties?

Steel and aluminum parts imported into the US can be subject to additional duties under Section 232, depending on their tariff (HTS) classification, and the rates have changed several times since 2025. Please confirm the current rate for your part with your customs broker; we provide the material, weight and specification data the broker needs.

Which quality certifications do you hold?

ISO 9001:2015, certified by IQR International (certificate QMS-014904). We run PPAP, 8D, SPC and MSA, and held IATF 16949 certification from 2018 to 2021.

Who are your current customers?

Since 2004 we have supplied manufacturers including Ford Otosan, Karsan, CNH Industrial, AGCO and Türk Traktör, and we export to 10 countries, mainly France, Germany, Brazil, Finland and Italy.

Upload your drawing (STEP, IGES, PDF, DWG, DXF) and it goes straight to our engineering team.